Phase I/II Design & Phase III Construction Services
Project Scope:
Sterling Avenue is a 4-lane urban arterial that extends north from IL Route 8 (Farmington Road) in West Peoria to U.S. Route 150 (War Memorial Drive) in Peoria. The project limits extended from Farmington Road to the intersection with Nebraska Avenue. The project was a complete reconstruction with all-new PCC pavement, curb & gutter, sidewalks, driveways, storm sewer, and pipe underdrains.
The project was selected by the Peoria & Pekin Urbanized Area Transportation Study (PPUATS) to receive $3.1 Million of Surface Transportation Urban Funds.
The City of West Peoria retained Hermann & Associates to complete the Phase I project development report and the Phase II construction plans. As part of the study, Hermann & Associates coordinated with IDOT on the geometrics of the intersection of Sterling Avenue and Farmington Road to improve safety and reduce the potential for crashes. Hermann & Associates also provided Phase III construction services for this project. The project was processed through the IDOT District 4 Bureau of Local Roads and was bid on a state letting.
Project Elements:
Topographical & Boundary Survey (Subconsultant)
Phase I Project Development Report
Traffic Management Plan
Phase II Construction Plans & Specifications
Quantity Computations & Cost Estimate
Environmental Survey Request
Pavement Design
Horizontal Alignment, Vertical Profile, Cross Sections
Intersection Geometrics & Grading Plans
Erosion & Sediment Control Plans
Storm Sewer Design
ADA Ramp Design
Right of Way Plats (Subconsultant)
Land Acquisition
Public Meetings & Coordination
Utility Coordination
Construction Inspection & Documentation
Materials Testing
Project Financials:
Funding Source: STU
Construction Cost: $2.1 Million